China-linked batteries lead Ofgem storage shortlist Skip to content
Storage container units stacked in an industrial yard.
Renewables and new tech 4 min read

China-linked batteries could win UK storage support despite security warnings

C

Charles Osborne

Contributor

Battery projects linked to China are expected to win UK state support despite security warnings, The Guardian reported on 25 November 2026. The support is Ofgem’s first round of cap and floor awards for long duration electricity storage. Of the 16 projects Ofgem said in June it is minded to back, 11 use lithium-ion batteries, which The Guardian says are “typically manufactured in China and operated with Chinese software”. Ofgem’s final decision is expected in the coming weeks. Nothing changes for businesses yet.

The facts

  • Who: Ofgem, Great Britain’s energy regulator.
  • What: its shortlist of storage projects to get cap and floor support. The 16 projects add up to 7.645GW of storage capacity, according to the Renewable Energy Association’s summary of Ofgem’s consultation.
  • The mix: 11 lithium-ion battery sites, three pumped storage hydropower schemes, one compressed air scheme (TeesCAES) and one vanadium flow battery project (Frontier Legacy). On our own maths, the 11 lithium-ion sites come to 3,630MW, just under half of the total.
  • When: Ofgem consulted from 26 June 2026. The REA summary said a final decision was due in autumn 2026. The Guardian says the regulator “is expected to confirm the final projects selected for financial support in the coming weeks.”
  • Is anything compulsory? No. This is support for storage developers, not a rule for energy users.

Who is on the list

The biggest schemes are pumped hydro in the north of Scotland: Gilkes Energy’s Earba (1,800MW), SSE Renewables’ Coire Glas (1,440MW) and Statera Energy’s Loch Kemp (660MW).

The lithium-ion sites are spread across Scotland and England. Field has five: Netherton, New Deer, Rigifa and Fyrish in the north of Scotland, and Long Stratton in the east of England. Statera Energy has East Claydon and Sundon. The others are Eku Energy’s Ocker Hill, Innova’s Drakelow, EDF and Luminous Energy’s Springwell, and Windel Energy and Recurrent Energy’s Thornton BESS 2.

The security row

The Guardian reports that Field and Statera, which are behind seven of the shortlisted lithium-ion projects, have “long-established links to Chinese manufacturers which provided the batteries used in past projects”. It says Field has typically sourced its batteries from Envision Energy, and Statera has used Envision and Sungrow. The paper says Sungrow was the subject of an “ethical hack” earlier this year by a German cybersecurity company, which claimed it accessed hundreds of thousands of solar installations across Europe.

The paper also says Ofgem’s assessment is “heavily weighted towards the cost of each project”. It considers each project’s IT and security measures mainly for whether they could delay delivery, and “does not appear to specifically consider the risk of security breaches during the lifetime of the projects”, though developers must follow the government’s cybersecurity guidance.

It cites a report by Michael Collins, a former deputy head of national security strategy at the Cabinet Office, warning that Europe is “sleepwalking” into economic and national security problems by relying on Chinese-made green technology.

What they said

  • Ofgem: “We assessed projects against the legal and policy framework set by government and parliament, and are carefully considering consultation responses before reaching final decisions.”
  • Field and Statera: both said they take security seriously and comply with all national security guidance at their sites, The Guardian reports. Field’s chief executive Amit Gudka said the company wants to help build a UK battery manufacturing industry.
  • The UK government: “The security of our energy system is our priority and we are taking action to build secure and resilient battery supply chains and reduce vulnerabilities, while investment in the UK’s energy sector is subject to the highest levels of national security scrutiny.”
  • Invinity Energy Systems: the British vanadium flow battery maker has one project on the list, and The Guardian says it threatened to reconsider its plans to manufacture in the UK.

Why storage matters

The Guardian says Ofgem is under pressure to back storage that can release power for at least eight hours, “to help reduce the cost of balancing the grid”. On 25 November 2026 we covered the £800m Coalburn battery project in South Lanarkshire in £800m batteries at Coalburn store spare wind power.

The questions worth asking

  • Who pays if the floor is used? The REA summary explains that money above the cap goes back to consumers. Neither source sets out who funds the floor when a project earns less.
  • Will security change the list? Ofgem says it is still weighing consultation responses.
  • Where will the batteries come from? The shortlist doesn’t name suppliers for the new projects.

What does this mean for your business?

  • Storage is meant to cut balancing costs. Our take: balancing costs end up in every business electricity bill, so storage that cuts them is good news, as long as the support scheme itself is good value. Send us your bills and we’ll show you what non-commodity costs you pay.
  • Thinking about your own battery? Security and supply chain questions apply on site too. Ask us about battery storage alongside solar power, and we’ll talk you through what to check before you buy.
  • Sort the contract early. Arrange your business electricity contract as far ahead as you can, so you’re choosing with time on your side.

Talk to our energy experts

Want to talk through storage, solar or your next electricity contract? Book an appointment with our team, get a quote, or call us on 01273 914000.

Book an appointment

Terms in this article

Long duration electricity storage
Storage that can hold electricity and release it for eight hours or more. It stores power when renewables produce a surplus and prices are low, then sells it back when the grid needs it. Source: r-e-a.net
Cap and floor
A support scheme where a project's revenue is guaranteed a minimum level (the floor) even if market conditions are poor, and profit above a maximum (the cap) is paid back to UK consumers. Source: r-e-a.net
Minded-to decision
A decision Ofgem proposes and consults on before making it final. It can change after the consultation. Source: ofgem.gov.uk
Pumped storage hydropower
A storage scheme that pumps water uphill into a reservoir when power is cheap and lets it flow back down through turbines to generate electricity when it is needed. Source: r-e-a.net
Vanadium flow battery
A type of battery that stores energy in liquid electrolyte held in tanks, rather than in solid cells like a lithium-ion battery. Source: r-e-a.net
GET IN CONTACT WITH US
Have a question about your energy strategy?

01273 914000

Free tools for your business

Get a Quote

Call Back Request

Book an Appointment

Update Contract End Date

Half Hourly Report Unsubscribe