Live England Electricity Generation and Carbon Skip to content
Live grid

What's powering England right now?

England's live electricity mix, carbon in all ten regions and the cleanest times to use power, from the grid operator's own figures
Fetching the latest figures… See your area
– renewable

England's electricity mix

    Region by region

    England has ten network regions, each run by its own network operator. They can look very different at the same moment: windy northern regions next to southern ones leaning on gas and imports. Here's how each one looks right now, cleanest first. Hover over or tap the map to see any region.

    Map of England's network regions, coloured by carbon right now
    Carbon nowVery lowLowModerateHighVery high

    When's the cleanest time to use power in England?

    Step 1 of 3

    See the grid where your business is

    Pop in your site's postcode and we'll show you your local grid and the cleanest hours to use power there. Nothing is saved at this step.

    Step 2 of 3

    Want a plan for this site?

    Tell us who you are and we'll put together when your site should use power, what half-hourly settlement means for your costs, and which contracts suit how you work.

    When you press the button we keep your company name, site postcode and what you entered in this tool, and may contact your business about your results and your energy contracts. See our privacy policy for how we handle your data.

    Step 3 of 3

    Let us check your meter

    Give us permission and we'll check your meter details and your Estimated Annual Consumption with the industry, so your plan uses your real figures. It's free and there's no obligation.

    Meter Information and Data Access Authority

    We will use this to obtain your meter, supplier and consumption information so we can provide quotations and arrange utility procurement. This does not place you into a contract, does not commit you to a quote, and there is no fee for obtaining this information. Your authority lasts 12 months unless you tell us to stop sooner.

    What this authority allows, and what it doesn't

    It allows us to:

    • Obtain supplier information.
    • Obtain meter information.
    • Obtain consumption information.
    • Contact suppliers regarding this information.

    It does not:

    • Place you into a utility contract.
    • Require you to accept a quotation.
    • Create any fee solely for obtaining this information.

    Version MIF-DAA-v1.0. You can withdraw it at any time by emailing [email protected].

    We'll use these details to obtain your meter, supplier and consumption information and to contact you about it. We keep the authority record, with the date, time, IP address and browser, as proof of your permission. See our privacy policy for how we handle your data.

    Here's how much carbon each unit of electricity in England is forecast to carry over the next 24 hours.

    How England's grid works

    England uses most of Britain's electricity. Offshore wind farms in the North Sea land their power on the east coast, nuclear stations run around the clock, gas fills in the gaps, and solar's strongest in the south and south west.

    Most of the undersea cables from Europe come ashore in Kent, with others in Lincolnshire and Northumberland, so the South East often runs on imported power.

    • Coal Ratcliffe-on-Soar in Nottinghamshire, Britain's last coal power station, closed on 30 September 2024.
    • Nuclear Sizewell B in Suffolk, Heysham in Lancashire and Hartlepool keep running day and night. Hinkley Point C is being built in Somerset.
    • Wind Some of the world's biggest offshore wind farms, like Hornsea and Dogger Bank, sit off the Yorkshire coast.

    What it means for your business

    Your network region shapes part of your bill, and with half-hourly settlement coming in, when you use power will matter as much as how much. If your sites can shift work away from the early-evening peak, you'll cut carbon and costs. We'll help you find a contract that suits how you work.

    Get a quote

    Ready for half-hourly settlement?

    Business electricity is moving to half-hourly settlement (MHHS), so when you use power is about to matter as much as how much. See what it means for your site.

    Check your MHHS risk
    Map of the UK by nation, coloured by carbon right now
    Carbon nowVery lowLowModerateHighVery high

    See another nation

    Tap a nation on the map, or pick one below.

    See all of Britain live, with imports and supplier fuel mixes
    See the live grid in

    Northern Ireland runs on a separate grid shared with Ireland, so its figures come from SONI, the grid operator there.

    Live figures: the mix, carbon intensity and forecast for England, and each network region's, from the NESO Carbon Intensity API (CC BY 4.0). Regional figures are NESO's estimates of the electricity used in each region, including power flowing in from elsewhere, and are updated every half hour.

    See how much you could be saving

    For more information
    01273 914000

    To talk about your business electricity, phone us on the number above, or request a quote and one of our energy experts will call you at a time that suits you.

    Get a Quote

    Call Back Request

    Book an Appointment

    Update Contract End Date

    Half Hourly Report Unsubscribe