RTS Meter Switch-Off: What You Need to Know Skip to content
News Updated 8 min read

RTS Meter Switch-Off: What You Need to Know

C

Charles Osborne

Contributor

*UPDATE (October 2026): The RTS switch-off was phased in from June 2025, and as of October 2026 support for RTS meters has ended. To find out how it played out and how it affects your business, read our update below.

Don’t Get Left Behind

From June 2025, the UK marked a major shift in energy infrastructure as the Radio Teleswitching (RTS) system was retired. This is more than just a technical update—if your business still relies on an RTS meter, it’s time to take action.

Now the signal has been switched off, these meters may no longer be able to switch between peak and off-peak rates automatically. That could disrupt your tariff schedules, affect billing accuracy, and ultimately increase your energy costs if not addressed in time.

At Black Sheep Utilities, we’re here to make the transition seamless. Instead of navigating this change alone or chasing suppliers, let us guide you through what it means—and how to upgrade with minimal disruption.

digital electric meters in a row measuring power u 2025 03 09 19 08 59 utc scaled

What Are RTS Meters?

RTS meters have been used for decades to support multi-rate tariffs such as Economy 7 or Economy 10. These meters receive radio signals to control when certain appliances (like storage heaters) switch on or off, allowing users to benefit from cheaper off-peak electricity rates.

While once cutting-edge, the technology behind RTS meters is now outdated and difficult to maintain. The network powering these signals has been turned off, and with it, RTS meters may stop functioning as intended.

Why Has RTS Been Switched Off?

The RTS system simply doesn’t meet the needs of today’s smarter, more sustainable energy market. It’s been retired in favour of modern, connected solutions—namely, smart meters.

Rather than spend hours researching metering options or chasing suppliers, let Black Sheep Utilities take the pressure off. We’re already supporting clients through this change, ensuring they avoid disruptions and take full advantage of what comes next.

MHHS

What Does This Mean for Your Business?

If you’re still using an RTS meter, act now. But this isn’t just about compliance—it’s an opportunity to modernise your energy setup and cut long-term costs.

When you partner with Black Sheep Utilities, you can expect:

  • Real-time usage insights that help you reduce waste

  • Accurate billing thanks to automated meter readings

  • Access to new, more flexible tariffs that suit your business better

We’ll handle the switch from start to finish—no need for you to manage it internally or negotiate with suppliers.

Not sure if you’ve got an RTS meter?

You’re not alone—and that’s where we come in. We’ll carry out a free audit to check and let you know if you’re affected. No hassle, no jargon.

Here’s how we help:

  • Free Audit
    We’ll confirm if you’ve got an RTS meter and advise on the best upgrade path.
  • Ongoing Support
    Once you’re upgraded, we stick around—helping with tariff reviews, usage monitoring and more, so you get the most from your meter.

the incandescent lamp does not shine brightly and 2025 01 29 04 46 06 utc scaled

Why Upgrade with Black Sheep?

Switching away from RTS meters isn’t just ticking a box—it’s a chance to take control of your energy future. When you upgrade through Black Sheep Utilities, you gain:

  • Efficiency: Get a clear picture of your usage and cut unnecessary costs.

  • Savings: Access cost-effective tariffs and avoid being rolled onto default rates.

  • Sustainability: Join the move toward a smarter, greener energy grid.

Why Did the Signal Go, and How Many Meters Are Left?

RTS has been around since the 1980s, and as well as switching rates it can turn heating and hot water on and off at set times. It runs on the same ageing infrastructure as the BBC’s longwave radio signal, and that kit can no longer be adequately maintained.

The numbers have fallen fast. On 30 May 2025, 314,935 RTS meters in Great Britain still needed replacing. By January 2026, fewer than 154,000 were left. Even that may be too low, because industry records on older meters are widely accepted as incomplete. So don’t assume someone else has already checked your sites: we’ll check them for you.

What Does an RTS Meter Look Like?

Most RTS setups have a giveaway: a separate box near your electricity meter labelled “Radio Teleswitch”. Here are the other signs to look out for:

  • Electric heating that charges overnight: Storage heaters, panel heaters or an immersion tank.
  • No gas supply: A site with no local gas supply is more likely to have one.
  • A time-of-use tariff: Economy 7, Economy 10 or Total Heat Total Control.

Any meter that switches between peak and off-peak rates, or automatically turns your heating or hot water on, may use RTS too. So think about any part of your premises that has always run on electric heating: the back office, a storeroom, a flat above the shop. If you’re still not sure, send us a recent bill and we’ll speak to your supplier and find out for you.

How the RTS Switch-Off Played Out

The switch-off didn’t happen in one go. On 19 June 2025, the government announced that a widespread switch-off wouldn’t happen on 30 June. Instead, the first stage targeted small local areas with very few RTS customers, and suppliers contacted customers before any work started in their area.

From there, the signal was withdrawn from targeted groups across Great Britain, region by region. It paused through the coldest winter months and restarted in England and Wales on 2 March 2026, and that final stage ran until 17 June 2026, with groups of meters switched off week by week.

As of October 2026, support for RTS meters has ended. So if you’ve been waiting for an RTS switch-off date, there isn’t one still to come. If you’ve still got an RTS meter, now’s the time to replace it, and we’ll help you do it.

Still Got an RTS Meter: Why It Can’t Wait

An RTS meter that’s no longer getting a signal may not work as expected, and because the equipment is so old, any problems are harder to fix. We won’t sugar-coat it: if you’ve still got one, it needs replacing, or you risk losing control of your heating and hot water.

For a business, that can mean heating or hot water stuck on or off, and rates that no longer switch when they should. Imagine opening up on a cold Monday to find the storage heaters never charged overnight. Sites such as schools and care homes get urgent attention if their heating or hot water is disrupted, but you don’t want to wait for a breakdown to find out. If your site has an RTS meter, treat the replacement as urgent.

There’s protection if things drag. If you’re a micro-business and you aren’t offered an appointment within 60 working days of asking, you’ll receive automatic compensation. You may also receive £40 per fuel per meter point where appointment standards under the guaranteed standards of performance aren’t met. If your replacement is running late, tell us and we’ll chase your supplier.

After the Upgrade: Your Supplier, Your Meter and Your Price

Under its licence, your supplier must take all reasonable steps to replace RTS meters with smart meters. You don’t have to chase that on your own, though. We’ll find out whether your sites are affected, speak to the supplier for you and keep things moving.

Then there’s what comes next. Suppliers are generally keeping customers no worse off after a replacement, though some legacy features can’t be copied exactly. A smart meter also opens up time-of-use tariffs that RTS couldn’t support. When your contract is up for renewal, or if you’ve been moved onto an out-of-contract rate, we’ll compare supplier prices for your business electricity so your new meter is on a price that suits how you use power, whether you’re a small business with one meter or a larger site. Still mid-contract? Tell us your end date and we’ll plan the switch for the right time.

More Ways Black Sheep Utilities Can Help

  • Find out where you stand: Send us a recent bill for each site, which will show the MPAN we need, and we’ll speak to your supplier on your behalf. Our Letter of Authority (LOA) lets us help you, not make decisions for you. Help with your contracts, bills and supplier queries: yes. Enter into a contract on your behalf: no. Some brokers ask for a ‘level 2’ LOA that lets them sign contracts for you. Ours is a level 1 LOA, so only you can agree a contract.
  • A written comparison of suppliers: When it’s time to renew, we compare prices from suitable suppliers for your sites and present the options that best suit your business.
  • Bills checked after the change: Our bill validation checks each bill against your agreed rates and recorded consumption, and we take up any errors with the supplier.
GET IN CONTACT WITH US
Have a question about your energy strategy?

01273 914000

Frequently Asked Questions

What is an RTS meter, and what's replacing it?

An RTS (Radio Teleswitch) meter uses radio signals to switch between peak and off-peak rates, typically for tariffs like Economy 7 or Economy 10, and can turn heating and hot water on and off. The system is being replaced by smart meters, which your supplier must take all reasonable steps to install.

What does an RTS meter look like?

The usual sign is a separate box near your electricity meter labelled "Radio Teleswitch". Sites with storage or panel heaters that charge overnight, no gas supply, or an Economy 7 or Economy 10 tariff are the most likely to have one. Still not sure if you're affected? We'll carry out a free audit to confirm your meter type and talk you through your options.

When was the RTS switch off date?

There wasn't a single date. The phase-out began in small local areas from late June 2025 and ran region by region, with a final stage from 2 March to 17 June 2026. As of October 2026, support for RTS meters has ended.

What happens if I still have an RTS meter?

It may no longer work as expected, and you risk losing control of your heating and hot water. Get in touch with our Energy Team straight away and we'll speak to your supplier on your behalf about a replacement.

Can my business get compensation if the RTS replacement is late?

Yes. If you're a micro-business, you'll receive automatic compensation if you aren't offered an appointment within 60 working days of asking. Compensation of £40 per fuel per meter point may also apply where appointment standards aren't met. Tell us if your replacement is running late and we'll chase your supplier for you.

##### Need Help Navigating the Switch?

At Black Sheep Utilities, we specialise in helping businesses stay ahead of energy changes. We’re here to ensure your energy setup works smarter—not harder. If you think you've still got an RTS meter, or you're not sure, request a callback or ring our Energy Team on 01273 914000.

BOOK AN APPOINTMENT

Free tools for your business

Get a Quote

Call Back Request

Book an Appointment

Update Contract End Date

Half Hourly Report Unsubscribe